Assembly of the secondary shaft of the box (Fiesta 2)

            0

All parts must be thoroughly washed. Worn or damaged parts must be replaced. If necessary, gears must be replaced in pairs (both interacting gears).

Lubricate the new parts to be installed with molybdenum disulphide MoS ₂, covering the interacting surfaces of the parts with it. This also applies to the synchronizers and their working surfaces.

Circlips and expanders should not be ground to thinner thicknesses. These rings are available in five different thicknesses.

You should always select a ring that is thick enough to allow for a tight fit (but remember that the ring must be completely loosened in the groove).

All parts should be installed using the recommendations provided.

Rolling bearings and expansion rings must be mounted, paying attention to the markings indicating the assembly directions.






Link to this page in different formats


Visitor comments

No comments yet



We use cookies to ensure the site works smoothly, remembers your settings, and is convenient for you 🍪